Soil nailed structures

Where this fits: Docs Atlas › Geotechnical structures › Soil nailed structures (EN 1997-3 Clause 10)

Nailed walls and slopes, including temporary nailed excavation faces, with a shotcrete or mesh facing. FHWA GEC 7 was the usual design reference before the second generation of EC7. Anchors with a free length are anchors.

next lift pull-out water pressure punching face deformation sliding Nailed wall Nailed slope Excavation in lifts shotcrete facing mesh and plates the nailed block as a gravity wall
Check Limit state Analysis type Usual methods
External stability: sliding, bearing, overall ULS (GEO) Stability limit equilibrium
Nail pull-out and tensile failure ULS (GEO, STR) Stability limit equilibrium, formulas
Facing failure (punching, bending) ULS (STR) none (structural) formulas
Face deformation SLS Deformation FEM, empirical
Water pressure behind the facing ULS, SLS Groundwater flow formulas
  • Limit equilibrium with nails: Slide2, Slide3, GeoStudio SLOPE-W, GEO5 Slope Stability
  • FEM: PLAXIS 2D, PLAXIS 3D, RS2

Execution standard: EN 14490 (soil nailing).


Checked 2026-11-13 against the EN 1997-3:2025 clause list from secondary sources, not against the EN 1997-3 text.